How to pay a contractor, draws and retainage | EZ Path Capital
Pay a contractor in stages, tied to work you can see and check. On a 60,000 dollar rehab, that means a 6,000 dollar deposit, three draws of 20,000 dollars each after an inspection, and 6,000 dollars held back until the punch list is done.