Land loan vs construction loan, which one you need | EZ Path Capital
The direct answer A land loan buys the lot and stops there. A construction loan pays for the land and the build, and it releases the build money in draws as the work is finished. If you want to hold a lot now and build later, a land loan fits. If your plans are ready and the build can start soon, a construction loan fits. On the deal in this guide, the lot costs 55,000 dollars, the build costs 245,000 dollars, and the all in cost is 300,000 dollars. A construction loan of 240,000 dollars covers 80 percent of that cost, with 60,000 dollars cash down. The finished house is worth 400,000 dollars, it rents for 3,200 dollars a month, and it refinances into a 300,000 dollar rental loan.