Permits on a hold rehab, what needs one | EZ Path Capital
The direct answer Most of the work on a hold rehab needs a permit when it touches structure, wiring, plumbing, heating and cooling, or the roof. Paint, new floors, and swapping a fixture for the same kind of fixture usually need no permit at all. On the deal in this guide, budget 225 to 900 dollars for permits and plan for 2 to 4 weeks of review time. The permit is cheap. The delay from skipping one is the expensive part.