Schedule of Values: The Budget Sheet Behind Every Draw | EZ Path Capital
The direct answer A schedule of values is the priced list of every part of your build, and every construction draw is paid from that list. The lender pays for work that is done, line by line, and the sheet shows the dollar value of each line and the money still held back. On the build in this guide, the sheet lists 18 lines that add to 245,000 dollars of build cost, and the five draws from the 240,000 dollar construction loan follow those lines from the first shovel to the last coat of paint.