The direct answer A construction draw gets held up when the lender cannot confirm that the work in the draw request is done, paid for, and inside the budget. The most common hold is an inspection that finds less work complete than the draw asks for. A clean draw packet fixes most holds: a draw request that matches the schedule of values, photos of the work, paid invoices, lien waivers, and an inspection that lines up with the numbers.